Monday, January 31, 2011

Seeds, Seeds & Seeds! What should I grow?


The seed catalogs arrived at my house around the middle of December to early January. In between working on the house, I have been having fun reading over the catalogs and deciding what I need to order. I need to make up my mind since next Sunday is week 14 and if I am going to grow geraniums they need to be start by the fourteen week before I plant them outside. A lot of the annual flowers (ex: petunias) are usually 12-10 weeks out following with peppers, tomatoes, cabbage, Brussels sprouts, ECT. I have been going through my seeds from last year, writing up the orders and editing the previous year seed database. There is a light at the end of the tunnel; winter will end even if there is a major bizzard coming tomorrow.

Wednesday, January 26, 2011

Morris-like Chairs










Here are two more chairs I reupholster last summer. The wood needs to be refinished but I can at least sit on them now. The chairs now sit on my three-season porch. Both chairs' cushions were covered with swayed leather.

Tuesday, January 25, 2011

It has been a while since I lasted put out a Post.

Well, what have I been doing these last two months? Beside the holiday stuff, I cut in a bathroom fan before the first snow fall and I am still waiting for the electrician to wire it in. I raked the roof four times between December 8 to December 28 because I was worried about ice dams forming from all the snow on it. We had a thaw on December 30 to 31 and the roof was fine but the gutter downspout near back porch froze solid and water was running on the outside so I spend 2-3 hours with a heat gun defrosting the downspout the day before the thaw.

I finely put back the shoe base molding; it was pulled off over 6 six years ago when I was refinishing the wood floors. Before I could lay the molding down, I filled the larger gaps between the floor and baseboard with foam insulation. Allowed the foam to dry, cut off the excess then applied a bead of caulk before nailing the molding it place. This has cut down on cold air drafts and made the house feel warmer.

I also finished a project I started last winter. Last winter I was working on the storm/screen door to the three season porch. I finished stripping, painting, and hanging the door last March but never got around to painting the storm window for it. I finished painting it in October and replaced the screen with the freshly painted storm window.

These last two weeks, I have been back in the basement working on another unfinished project waterproofing the basement. I started working on this last winter and wrote about it in "Moisture and Water Problems, Part 1 -3". I finished cleaning the exposed south basement wall and 3/4 of the east wall. I cleaned the areas with wire brushes attached to an electric drill. I put off a lot of loose cement. Here are some pictures of the cleaned walls.


Last Saturday, it took 6½ 10-lb buckets of hydraulic cement to fill all the holes in the prepared walls. Next I plan to buy 2" sheet of foam board insulation and cut it to size fill in between the studs above the fountain to the basement ceiling. I was using the spray foam but that been to messy, the foam would fall in on itself and on the floor. Using the solid foam board and filling in the cracks between the board and studs should work out better.

That is what I been doing on the house these last two months. I will try to be more current on my posting this year.