Reviewing this list has brought back memories and there are still many unfinished items.
- Finish Swan: Years ago I brought my Mom a topiary swan frame from http://www.topiaryinc.com/ and used sphagnum moss to fill out the frame. She received this one Mother’s Days. In 2008 the Kickapoo River flooded town of Gays Mills, my Mother was lucky the yard, garage and basement were flooded but not living area of her home. The topiary swan was sitting in that dirty water and all the old sphagnum moss was removed and need to be replaced with fresh moss. I did finish working on the form in the spring of 2010 and it now back in her garden every summer.
- Put together the Turtle: Another topiary frame, Rittenhouse use to sell a turtle basket frame. The turtle was finished in the summer of 2010.
- Fix electric outlet hole on the outside of the house: The hole until this year plugged with a broken shovel handle until this summer. I filled it in with foam but need to fill in the remainder of it with wood putty. This is the wall I stripped off the paint and will finish next spring or summer.
- Paint dryer hole cover: Before I brought the house the washer and dryer were placed in the northwest corner of the basement. A previous PO finished the north side of basement and the washer and dryer were moved but the old dryer vent was never closed off. I filled in the vent hole sanded it down and painted late 2008. So I must have made this list sometime in the fall of 2008.
- Make Bamboo Trellis: Completed in the spring 2009, this is the trellis which I weave my squash vine through.
- Wash unfinished south basement wall: completed in 1/3/2010
- Fix crack in wall: South basement wall, 2/3 of the wall was finished early spring 2010 and the remaining wall this spring 2011.
- Fix Cracks in floor: Complete over the 2009-2010 winter. See Moisture and Water Problems Part 3
- Paint Finished Craft room floor: See #8.
- Wash Closet Walls: Not done closet show in Moisture and Water Problems Part 3
- Paint Closet Walls: See #10.
- Shellac Closet doors: My bedroom closet has wooden bifold door which only ½ of the bifold door is done.
- Hang Closet door: Not done do to #12 not being completed.
- Lay out garden around telephone pole and box: Still on my To Do List but other things become more important so this keeps dropping down on the list.
- Call for a Watch Dog before digging up the garden around telephone box: Waiting for #14.
This is the fourth winter I been working and the basement and hopefully the last. I found that if I just put waterproof the basement as a project and had to wait four years to cross it off my TO DO List it would be discouraging. So I have been breaking down large projects into smaller projects so I feel like I accomplished something.